Project portfolio

Our projects

New homes, extensions, conversions, appeals and commercial schemes, each with the council, the documents we prepared and, where available, the application reference.

Our work by type

Projects by type

The number of jobs of each type in our project records, from house extensions to appeals and certificates of lawfulness.

12 projects

New homes & conversions

Replacement dwellings, new homes on infill and backland plots, and conversions to flats.

Planning constraints we check

New homes face the widest range of checks. Each scheme starts with a constraints review covering policy, design, ecology, trees, flood risk, highways and contributions, so the reports the council will ask for are commissioned at the right time.

  • Local Plan policies: Reading Borough Local Plan 2019 (CC7 design, CC8 amenity, H9 house extensions, H11 garden land); Wokingham Core Strategy CP3 and the Managing Development Delivery Local Plan (TB06 garden land); the Bracknell Forest Local Plan; West Berkshire Local Plan Review 2023 to 2041 (SP7 design quality); Spelthorne Core Strategy and Policies DPD 2009 (EN1); Slough Core Strategy and saved Local Plan policies; and the National Planning Policy Framework.
  • Design guidance: The Wokingham Borough Design Guide SPD, Reading's Residential Conversions SPD and design guidance, the Slough Residential Extensions Guidelines SPD and the Bracknell Forest Design SPD, which set rules on scale, roof form, materials, set backs and separation distances.
  • Space standards and amenity space: The Nationally Described Space Standard for new homes and flats, private garden and amenity space, bin and cycle storage.
  • Neighbour amenity: Daylight and outlook tested with the 45 and 25 degree methods in BRE 209 (Site layout planning for daylight and sunlight), overlooking distances, overshadowing and the effect of new windows on neighbours' privacy.
  • Ecology and biodiversity: Bat and nesting bird checks under the Conservation of Habitats and Species Regulations 2017, preliminary roost assessments where roofs or old buildings are affected, and Biodiversity Net Gain under the Environment Act 2021 with the statutory biodiversity metric (householder applications are exempt).
  • Trees: Tree Preservation Orders and conservation area trees, root protection areas, and tree surveys, arboricultural impact assessments and protection plans to BS5837:2012 where building works come close to trees.
  • Flood risk and drainage: The Environment Agency flood map (Flood Zones 1 to 3), site specific flood risk assessments, the sequential test for new homes in higher risk zones, and sustainable drainage (SuDS) for surface water.
  • Highways and parking: The council's parking standards, access and visibility splays, Manual for Streets, refuse and delivery vehicle access, cycle storage and, for larger schemes, transport statements.
  • Heritage: Listed buildings and conservation areas under the Planning (Listed Buildings and Conservation Areas) Act 1990 and NPPF chapter 16, with heritage statements where needed.
  • Green Belt, landscape and the Thames Basin Heaths: Green Belt tests on proportionate extensions and replacement buildings, National Landscape settings, and Thames Basin Heaths SPA mitigation (SANG and SAMM contributions) for new homes within 5km.
  • Community Infrastructure Levy: CIL liability under the Community Infrastructure Levy Regulations 2010 for new homes and extensions over 100 square metres, with self build and residential extension exemptions claimed before work starts.

42 projects in five groups

House extensions & alterations

Single and two storey extensions, loft conversions, garage conversions and garden buildings. Each group has its own page with planning guidance and every example.

5 projects

Planning cases

HMOs in controlled areas, committee approvals, appeals and certificates of lawfulness.

Planning constraints we check

Planning cases turn on evidence and procedure. We test each case against the policies the council relied on and the legal tests that apply before advising whether to proceed.

  • Evidence and procedure: For appeals, the Planning Inspectorate's procedural guide and the council's reasons for refusal; for certificates of lawfulness, sections 191 and 192 of the Town and Country Planning Act 1990 and the balance of probability test; for HMOs, Article 4 directions and the council's HMO and residential conversion policies.
  • Local Plan policies: Reading Borough Local Plan 2019 (CC7 design, CC8 amenity, H9 house extensions, H11 garden land); Wokingham Core Strategy CP3 and the Managing Development Delivery Local Plan (TB06 garden land); the Bracknell Forest Local Plan; West Berkshire Local Plan Review 2023 to 2041 (SP7 design quality); Spelthorne Core Strategy and Policies DPD 2009 (EN1); Slough Core Strategy and saved Local Plan policies; and the National Planning Policy Framework.
  • Design guidance: The Wokingham Borough Design Guide SPD, Reading's Residential Conversions SPD and design guidance, the Slough Residential Extensions Guidelines SPD and the Bracknell Forest Design SPD, which set rules on scale, roof form, materials, set backs and separation distances.
  • Permitted development and Article 4: Classes A to E of Part 1 of the General Permitted Development Order 2015, prior approval for larger rear extensions, and Article 4 directions that remove permitted development rights in parts of Reading, Wokingham and West Berkshire.
  • Space standards and amenity space: The Nationally Described Space Standard for new homes and flats, private garden and amenity space, bin and cycle storage.
  • Neighbour amenity: Daylight and outlook tested with the 45 and 25 degree methods in BRE 209 (Site layout planning for daylight and sunlight), overlooking distances, overshadowing and the effect of new windows on neighbours' privacy.
  • Highways and parking: The council's parking standards, access and visibility splays, Manual for Streets, refuse and delivery vehicle access, cycle storage and, for larger schemes, transport statements.

4 projects

Commercial

Commercial and institutional buildings, with the technical reports councils require.

Planning constraints we check

Commercial schemes are judged on their effect on neighbours and the street as much as on the building itself, so noise, odour, servicing and signage are planned and evidenced from the start.

  • Local Plan policies: Reading Borough Local Plan 2019 (CC7 design, CC8 amenity, H9 house extensions, H11 garden land); Wokingham Core Strategy CP3 and the Managing Development Delivery Local Plan (TB06 garden land); the Bracknell Forest Local Plan; West Berkshire Local Plan Review 2023 to 2041 (SP7 design quality); Spelthorne Core Strategy and Policies DPD 2009 (EN1); Slough Core Strategy and saved Local Plan policies; and the National Planning Policy Framework.
  • Use class, noise and odour: The Use Classes Order (Class E and hot food takeaways as sui generis), kitchen extraction to the EMAQ guidance, odour risk assessments to IAQM methods, noise assessments to BS 4142, hours of opening and servicing.
  • Shopfronts and advertisements: Shopfront design guidance and advertisement consent under the Town and Country Planning (Control of Advertisements) (England) Regulations 2007, judged on amenity and public safety.
  • Neighbour amenity: Daylight and outlook tested with the 45 and 25 degree methods in BRE 209 (Site layout planning for daylight and sunlight), overlooking distances, overshadowing and the effect of new windows on neighbours' privacy.
  • Highways and parking: The council's parking standards, access and visibility splays, Manual for Streets, refuse and delivery vehicle access, cycle storage and, for larger schemes, transport statements.
  • Flood risk and drainage: The Environment Agency flood map (Flood Zones 1 to 3), site specific flood risk assessments, the sequential test for new homes in higher risk zones, and sustainable drainage (SuDS) for surface water.
  • Heritage: Listed buildings and conservation areas under the Planning (Listed Buildings and Conservation Areas) Act 1990 and NPPF chapter 16, with heritage statements where needed.

Ready to get started?

Tell us about your project for a free, no obligation quote.

WhatsApp